Contract # PW/06-11
| Contractor: |
Quirk Construction Corp.
One Martel Way
Georgetown, MA 01833
|
| Project Time: |
May 2006 – June 2006
|
| Contract Value: |
$449,000
|
| Scope of Work: |
|
This work involves excavation, drainage, subgrade
preparation and rough grading for the future installation of an
infilled synthetic turf athletic field and paving for a resilient
track surface base. The final construction of the synthetic turf
and resilient track surface will be done by others under a separate
contract
Any questions may be directed to Robert J. Kefalas of
the Engineering Division at 617-730-2316 or by email at:
Rob_Kefalas@town.brookline.ma.us

|