|
View By Section Index
|
|
Section 1 - Introduction
|
|
Section 2 - Site Descriptions and Current Uses
|
|
Section 3 - Description of Regulatory Closure Process
|
|
Section 4 - Potential Post Closure Uses
|
|
Section 5 - Alternative Analysis
|
|
Section 6 - Stormwater and Wetland Impact Analysis
|
|
Section 7 - Noise
|
|
Section 8 - Other Potential Environmental Impacts
|
|
Download the
entire Book Marked Report 12.9MB PDF
|
|
|
|
|
|
Section 1 - Introduction
|
| 1.1 Purpose and Goals |
| 1.2
Public Review and Participation |
|
1.2.2 Landfill Closure CAC |
|
1.2.3 CAC Process |
| 1.3 Report Format and Contents

|
|
| Section
2 - Site Descriptions and Current Uses |
| 2.1 General Site Description |
|
2.1.1 Front Landfill |
|
2.1.2 Back Landfill |
|
2.1.3 Inactive Incinerator and Transfer Station |
| 2.2 Existing Conditions Analysis |
|
2.2.1 Existing Conditions Analysis - Front Landfill |
|
2.2.2 Existing Conditions Analysis - Back Landfill and Incinerator/Transfer Station

|
|
| Section 3
- Description of Regulatory Closure Process |
| 3.1 Introduction |
| 3.2
DEP Landfill Closure Requirements |
|
3.2.1 Landfill Closure Process |
| 3.3 Standard Cap Cross-Section and Alternative Caps |
| 3.4 Other Potential Permitting Requirements |
| 3.5 Results of Environmental Assessment |
|
3.5.1 Results of Draft CSA Reports |
|
3.5.2
Requirements and Status of Subsequent Environmental Monitoring in
Response to DEP C
Comments on Draft CSA Reports

|
|
| Section 4
- Potential Post Closure Uses |
| 4.1 Introduction |
| 4.2 Summary of Existing and Proposed Future Public Works Operations |
|
4.2.1 Leaf and Yard Waste Transfer, Wood Chip Storage and Brush Dump |
|
4.2.2
Temporary Storage of Catch Basin Cleanings, Street Sweepings and Trench Excavate |
|
4.2.3 Household Hazardous Waste |
|
4.2.4 Temporary Storage of Recyclable Materials |
|
4.2.5
Transfer Station |
|
4.2.6 Temporary Storage of White Goods and Metal |
|
4.2.7 Snow Dump |
|
4.2.8 Total Area Needs |
| 4.3 Potential Recreational and Open Space Uses

|
|
| Section 5
- Alternative Analysis |
| 5.1 Evaluation of Alternative Sites for DPW Operations |
|
5.1.1 Site Descriptions |
|
5.1.2 Conclusions - Alternative Sites for Public Works Operations |
| 5.2 Evaluation of Transfer Station/Incinerator Building |
|
5.2.1 Transfer Station Building |
|
5.2.2 Incinerator Building |
| 5.3 Evaluation of Alternative Uses of Landfill Sites |
|
5.3.1 Evaluation of Active Recreational Uses |
|
5.3.2 Evaluation of DPW Uses |
|
5.3.3
Conclusions - Landfill Post-Closure Use Alternative Analysis

|
|
| Section 6
- Stormwater and Wetland Impact Analysis |
| 6.1 Current Hydrology |
|
6.1.1 Lost Pond (Back Landfill) |
|
6.1.2 Saw Mill Brook (Front Landfill) |
| 6.2 Design Standards |
|
6.2.1 Solid Waste Management Stormwater Design Standards |
|
6.2.2 DEP's Stormwater Management Policy |
| 6.3 Proposed Stormwater Control Systems |
|
6.3.1 Bck Landfill |
|
6.3.2 Front Landfill |
| 6.4 Stormwater Quality Analysis |
|
6.4.1 Peak Flow Conditions Analysis |
|
6.4.2 Lost Pond Water Balance |
| 6.5 Water Quality Analysis |
| 6.5.1 Existing Conditions - Surface Water |
| 6.5.2 Proposed Conditions - Run-off Quality Back Landfill |
| 6.6 Wetland Resource Area Impacts |
| 6.6.1 Existing Conditions Back Landfill |
| 6.6.2 Proposed Conditions

|
|
| Section 7
- Noise |
| 7.1 Introduction |
| 7.2 Noise Descriptors |
| 7.3 Noise Impact Criteria |
| 7.4 Existing Noise Levels |
| 7.5 Noise Impact Analysis |
| 7.6 Mitigation Measures

|
|
| Section 8
- Other Potential Environmental Impacts |
| 8.1 Introduction |
| 8.2 Off-Site Odors |
|
8.2.1 Historic Sources of Odor |
|
8.2.2 Operations Improvements Already Implemented |
|
8.2.3 Future Operations |
|
8.2.4 Analysis of Potential Future Odor Impacts |
|
8.3
Aesthetics |
|
8.3.1 Existing Conditions |
|
8.3.2
Proposed Improvements |
| 8.4 Traffic |
| 8.5 Site Security and Access |
|
 |
|
|
|